GH17: Sheetrock & Gypcrete

Off & on over the past couple weeks, bits & pieces of the guest house & cottage have been done. The biggest of these is hanging the sheetrock (drywall), installation of tubing for the upper level’s in-floor radiant heating, and pouring gypcrete over the tubing. The gypcrete is curing now with help from fans & dehumidifiers. We now have heat on both floors, not to mention beautiful winter views (my internal PhotoShop removes the dumpster [not shown in this gallery]). Click on any images for full size.

Liberation Park’s 2016 Newsletter is posted here (in pdf also).

This entry was posted in Building, General, Guest House & Cottage. Bookmark the permalink.

Leave a Reply