Monthly Archives: September 2016

Gallery

GH10: wall framing

This gallery contains 23 photos.

This part goes amazingly fast, a mix of the nature of this phase, the desire to get a roof on, high quality crew, and Ross’s good planning. All materials arriving before needed. These images are from Monday morning thru Wednesday … Continue reading

Posted in Building, General, Guest House & Cottage | 1 Comment
Gallery

GH9: drying out

This gallery contains 13 photos.

Sunday’s forecast rain was slight and petered out quickly. Then some sun began the drying out. Still muddy around the site, so a week without rain, more sun, and a couple days of breezy should do some good. Looks promising … Continue reading

Posted in Building, General, Guest House & Cottage | Leave a comment
Gallery

GH8: colored concrete floors

This gallery contains 23 photos.

The lower floor of the guest house and the only floor of the guest cottage are colored concrete. They were poured on September 13th and since we’ve had a lot of rain, delaying further work. This post brings things up … Continue reading

Posted in Building, General, Guest House & Cottage | Leave a comment

GH7: heavy rain delays

Since the concrete floors were poured on September 14th, not much has happened due to the continuation of this year’s rainy tendencies. Our area is already way above average yearly rainfall totals, as exemplified by flooding in Monroe (ours) and … Continue reading

Posted in General | Leave a comment
Gallery

GH6: pipes, tubing, plumbing, & septic

This gallery contains 25 photos.

Next step was laying the plumbing and drain tile below the floors. Roy took care of the plumbing and Kevin laid drain tile with help from Santi. This drain tile will also allow for removing any radon build up before … Continue reading

Posted in Building, General, Guest House & Cottage | Leave a comment