Cabin finished 12

Wrapped up pretty good

Wrapped up pretty good

Back from the teaching weekend, the weather continues to be seasonally warm, tho we are still dodging rain some days. However, things are increasingly buttoned up so that the rain is a decreasing threat, even tho it continues to visit almost every day and persistently on some days.

Our special friends were back and make a great team with Roger, so the work flowed well, quickly, and with lots of good cheer. The OSB wall sheathing went up and then most of the house wrap.

We are now waiting for the windows and metal roofing to be delivered. Btw, we have a great local lumber yard that provides quality materials and excellent advice. Another of the many blessings of life in this part of Wisconsin.

This entry was posted in Building, General. Bookmark the permalink.

Leave a Reply