Guesthouse drawings – Final

Front Elevation of Guest House

Front Elevation of Guest House

We received the final drawings for the Guest House’s new design. This is what we hope to begin building in the Spring, as soon as weather allows. The Guest House will be built in front of the existing root cellar. As the ground is well sloped, the top story will be at the same level as the root cellar. The lower story will be dug in for easy accessibility in front. The wrap-around deck upstairs is spacious.

The drawings are now with our contractor who will give us a bid. You can see the main drawings on our website:

http://www.liberationpark.org/guesthouse.htm

click on any image to see a larger version of it

We are working to find the remaining funding in time to build next year.

This entry was posted in Building, General, Guest House & Cottage. Bookmark the permalink.

3 Responses to Guesthouse drawings – Final

Leave a Reply